CIPP Pipe Lining
Cure a new pipe wall inside a suitable existing lateral, often from a cleanout or limited access rather than a continuous trench.
Restore the lateral from a cleanout or small access when the host pipe can support a liner.
Cured-in-place pipe lining (CIPP) builds a continuous new wall inside a damaged sewer lateral. A resin-saturated liner is positioned and cured within the host pipe. Camera inspection is needed to assess diameter, access, offsets, collapses, and whether the existing pipe is suitable before lining is chosen.
Full details, process, and FAQs →